A Dairy Factory Project


 

● Compressor Unit for a Dairy Plant Project: F250S / Ammonia-Water Plate Heat Exchanger – NH3

 

 


 

 

● Compressor Unit F250S for a Dairy Plant Project / Ammonia–Water Plate Heat Exchanger – NH3 (On-site)

 

 


 

 

● Compressor Unit for a Dairy Factory Project – HS Series – CO2

 

 


 

 

● Compressor Unit for a Dairy Plant Project, HS Series – CO2 (On-site)

 

 


 

 

● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump

 

 


 

 

● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)

 

 


 

 

● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)

 

 


 

 

● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)

 

 

Based on statistical analysis of the customer’s actual operating data:

Daily steam savings of 28.33 tonnes;

Daily cost savings of RMB 7,000

A certain ice sport

10-inch touch screen for simple and intuitive operation; Siemens PLC; real-time monitoring and alarm functions; remote monitoring and control capabilities; ability to log operating parameters.



2026-02-04

A Dairy Factory Project

Based on actual operational data from the customer: daily steam savings of 28.33 tonnes; daily cost savings of RMB 7,000.



2026-02-04

Post a comment

Leave your phone number or email address, and we’ll contact you within 24 hours.