A Dairy Factory Project
● Compressor Unit for a Dairy Plant Project: F250S / Ammonia-Water Plate Heat Exchanger – NH3


● Compressor Unit F250S for a Dairy Plant Project / Ammonia–Water Plate Heat Exchanger – NH3 (On-site)


● Compressor Unit for a Dairy Factory Project – HS Series – CO2


● Compressor Unit for a Dairy Plant Project, HS Series – CO2 (On-site)


● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump


● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)


● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)


● Compressor Unit for a Dairy Plant Project – HS Series – NH3 Full-Heat-Recovery High-Temperature Heat Pump (On-Site)


Based on statistical analysis of the customer’s actual operating data:
◆ Daily steam savings of 28.33 tonnes;
◆ Daily cost savings of RMB 7,000
10-inch touch screen for simple and intuitive operation; Siemens PLC; real-time monitoring and alarm functions; remote monitoring and control capabilities; ability to log operating parameters.
2026-02-04
Based on actual operational data from the customer: daily steam savings of 28.33 tonnes; daily cost savings of RMB 7,000.
2026-02-04
Contact Information
Office Address: Room 103, Unit 3, No. 103 Honggang Road, Ganjingzi District, Dalian City
Landline phone:0411-86668510
Factory Address: No. 412, Baiyang Road, Tieshan Subdistrict, Lushunkou District, Dalian City
Other contacts: Zhang Xu,13941166501
Follow us
Copyright 2025 Dalian Bing Sen Lin Refrigeration Technology Co., Ltd. All Rights Reserved
Powerby:www.ceglobal.cn